Skip to content

Cancel/Change Order

Last updated:

Group orders change. A sister-in-law texts her size after you have already checked out, the youngest decides he wants the hoodie instead of the tee, or you look at the order confirmation the next morning and see “Gul Harbor” where “Gull Harbor” should be. This page explains the 24-hour window for cancelling or changing a Tide Tee order, exactly how to ask, what can be changed, and how quickly a cancelled order is refunded.

Cancelling or changing at a glance

  • The window: within 24 hours of placing your order.
  • How: email support@tidetee.shop with your order number. Email is our only support channel.
  • After 24 hours: your order may already be in production, because everything is printed after you order.
  • Cancelled orders: refunded within 7 days of our confirmation, to your original payment method.
  • Replies: within 24 hours on business days.

1. Why the window is 24 hours

Every Tide Tee item is made to order. Once your order goes to our production partner, your town name and year are printed onto the actual sweatshirt, tee, towel or tote that will be sent to you. The making stage takes 1–3 business days, and it can begin soon after you check out. The 24-hour window is the period in which a cancellation or change can usually be made before that happens.

The window is counted from the time on your order confirmation email. An order placed at 9:40 pm on Tuesday can be changed by emailing us before 9:40 pm on Wednesday. The window runs on the clock, not on business days, so a Saturday morning order has its window end on Sunday morning. Please email as soon as you know; you do not need to wait for a reply from us before your request counts.

2. How to cancel or change an order

  1. Send one email to support@tidetee.shop. Our Submit a Ticket page has a ready-made link with the subject “Change my order” or “Cancel my order” already filled in.
  2. Include your order number from the confirmation email, and the name and email address used at checkout.
  3. Say exactly what you want. “Cancel the whole order” or “Change item 3 from M to L” is better than “something is wrong with my order”. For text changes, type the corrected town name, year or family line in full, in capitals if you want it printed in capitals, exactly as it should appear.
  4. Watch for our confirmation. We reply within 24 hours on business days. Your change or cancellation is final once you receive our confirmation email.

The time stamp on your email is what counts for the 24-hour window. If you email within the window and our reply comes after the window has closed, your request still counts as made on time.

3. What you can change within the window

Changes we can usually make within 24 hours
What you want to change What to send us Note
Town name or year on a Town & Year item The corrected text, typed exactly Up to 18 characters on apparel and totes, 20 on towels; year is 4 digits
Layout on the sweatshirt or tee The layout you want: Town + year, Town + family line, or Town + since year Family line up to 22 characters
Size Item and new size 2XL and 3XL cost $2 more; 4XL and 5XL cost $4 more
Colour or design Item and the new colour or design Must be one offered on the product page
Quantity, or add or remove an item What to add or remove A removed item is refunded within 7 days of our confirmation
Shipping address The full corrected address Must be in the US, Canada, Australia or New Zealand

If a change makes the order cost more, for example moving a tee from L to 3XL, we tell you the difference and how to pay it before we make the change. If a change makes it cost less, the difference is refunded within 7 days of our confirmation.

4. The “Since” layout and family lines

Two of the most common change requests are about wording, not size. On the Town & Year Crewneck Sweatshirt and Town & Year Beach Tee, “Town + since year” means the year of your own first summer in that town, the year the family first rented the house or first walked the boardwalk, not the year the town was founded. If you entered the wrong year, or realise Grandma’s first summer there was 1987, not 1989, email us within 24 hours with the corrected year.

Family lines such as THE ALDER FAMILY can be up to 22 characters. If you are changing the line, count the characters including spaces. We print exactly what is typed, and we do not send a proof or mockup before production, so the corrected text in your email is what goes on the shirt.

5. Cancelling an order

To cancel an entire order, email us within 24 hours of placing it with the words “cancel the whole order” and your order number. To cancel part of an order, list the items to remove. Once we confirm, nothing from the cancelled part is made or shipped.

A confirmed cancellation is refunded within 7 days, to the payment method you used at checkout. If you cancel only part of an order, the refund is for that part, and the rest of the order carries on as normal. Full detail on how refunds work is on our Refund Policy page.

6. After the 24 hours

After 24 hours your order may already be in production. Email us anyway: if we can still make a change, we will tell you. If the order has already been printed, it is made and shipped as ordered, and you have the full 60-day return window from delivery under our Returns & Exchanges Policy. That includes personalised items, with return postage paid by us.

Once a parcel has shipped, it cannot be cancelled. If the only problem is the address, contact us with the tracking number and the correct address and we will help you work out the next step.

7. Real situations from beach-week ordering

The misspelled town, noticed over coffee

You place the house order at 11 pm after finally hearing back from every cousin. At 7 am you reread the confirmation and see the town name is missing a letter. You are well inside the 24 hours. Send one email with the order number and the correct spelling typed out in full, and wait for our confirmation. That is all.

The size that arrives late in the group chat

Your brother-in-law answers two days after you ordered and says he is a 4XL, not the XL you guessed. The order is past 24 hours and may already be in production. Email us to ask; if it cannot be changed, the simplest route is a new order for the 4XL now, so it is made on the normal timeline, and a free return of the XL once it arrives.

The beach-house gift going to the wrong house

You ordered a printed beach towel for the family who owns the rental, then remembered they spend the off-season at their other address. Email us within 24 hours with the new address in full, and once we confirm, the order goes to the new address.

A December order from Australia

You order Town & Year tees for a family week at the beach in January, and the next day realise the year should be the coming year, since the trip is after New Year. If you are within 24 hours of ordering, email the corrected year and we will update the order.

8. Addresses, email addresses and delivery countries

Checkout only offers shipping to addresses in the United States, Canada, Australia and New Zealand, so a change of address has to stay within those four countries. If you realise after ordering that the street number, unit, town or postal code is incomplete, email the full corrected address within 24 hours. If you would rather cancel than change the address, say so, and a confirmed cancellation is refunded within 7 days of our confirmation.

A typo in your email address is a different problem: the order goes through, but the confirmation and tracking emails go somewhere you cannot read them. If you never received an order confirmation, email us from the address you meant to use, with your name, the shipping address and roughly when you ordered. We will find the order with you and update the email address on it, so the tracking link reaches you when the parcel ships.

Fixed-design items

Hats, and the tees, hoodies, towels and totes outside the Town & Year range, carry fixed designs with no typed text. Within 24 hours you can still change their size, colour, design or quantity, or remove them from the order. Hats are one size and adjustable, so the only change to a hat is its design or colour. Hats are not personalised, so we cannot add a town name or year to one.

9. Tips that save a change request

  • Collect every size before you check out. A simple list in the group chat, name and size, catches most problems.
  • Read the live preview out loud: town, year, family line. Spelling mistakes are easier to hear than to see.
  • For the “since” layout, ask the person who would know the year: often the grandparent who first booked the house.
  • If you are not sure about a size, the Size Guide explains how to measure a garment you already own and compare it with the chart on the product page.
  • Check the shipping address once more, especially unit numbers and postal codes.

10. What a change does not affect

Changing or partly cancelling an order inside the window does not cost you any of the things that come with every Tide Tee order. Shipping stays free, with no minimum, even if you remove items and the order becomes a single tee. Every item that is made and shipped still has the full 60-day return window from delivery, with return postage paid by us. Items you did not ask to change are left exactly as you ordered them. And store credit already on your account is not touched by a cancellation; if part of the order was paid with store credit, tell us whether you want that part back as store credit, which never expires.

The delivery estimate on our Shipping & Delivery page, 1–3 business days of making plus 7–14 business days in transit, applies to the order as confirmed after your change.

11. Common questions

Is there a fee to cancel?

No. A cancellation confirmed within the 24-hour window is refunded in full within 7 days of our confirmation.

Can I change my order by phone or chat?

No. Email is the only way to reach Tide Tee. It also gives both of us a written record of exactly what was changed.

Can I edit the order myself in My account?

The My account page shows your order and its status, but changes to an order are made by email so we can confirm them in writing.

Can I cancel one person’s items from a big family order?

Yes. Within 24 hours, list the items to remove, for example “the two youth tees and the navy hoodie in L”. Only those items are cancelled and refunded; the rest of the house order carries on.

I emailed within 24 hours but have not heard back.

Your request counts from the time you sent it. We reply within 24 hours on business days, so a message sent on a Saturday is answered by the following business day. Check your spam folder for our reply too.

12. Contact us

Email support@tidetee.shop with your order number, and write “Cancel” or “Change” in the subject line. For the status of an order, see Order Tracking, and for delivery times see Shipping & Delivery.

Tide Tee, 10804 Goodrich Ave S, Bloomington, MN 55437, US.